finished the reflectix and taping except for the door, which i have built and have half installed. i will still have to install gasket material around it.
outside temp is 91 right now and the temp in the room is 82. this is with five ac openings and the door opening all open.
i didn't see the 1 awg, thanks, i think i will go ahead and get that. i will get three 166 ft lengths from it. that should do it.
it's .22 lbs per linear ft so all three at .66 lbs per ft. 80 ft suspended would weigh about 52 lbs. that's pretty heavy and the hardware would probably cost more than conduit. i can get all three lines in a piece of 1.5" conduit.
outside temp is 91 right now and the temp in the room is 82. this is with five ac openings and the door opening all open.
i didn't see the 1 awg, thanks, i think i will go ahead and get that. i will get three 166 ft lengths from it. that should do it.
it's .22 lbs per linear ft so all three at .66 lbs per ft. 80 ft suspended would weigh about 52 lbs. that's pretty heavy and the hardware would probably cost more than conduit. i can get all three lines in a piece of 1.5" conduit.