Well, after the failure of the previous crop, I'm starting something new, HPA aeroponics in buckets. I made an entire HPA system out of paint buckets and adapted it to my grow room.
Then for the tables I bought metal shelves and made a hole for the drains, since in each cube I put a 1/2" PP grommet, which goes directly into the PVC pipe that runs under the table.
And this is how it all looks, with the same distance and distribution for the growing space. Two tables and 18 buckets.
I also took advantage of the fact that I had everything disassembled to install the drain directly into the pipes in the same room, since I knew the pipe was right behind the closet. So I installed a hatch, punctured the pipe, inserted a drain plug, and voilà!
This is actually a huge relief. I won't have to run a hose down the hallway with the drain pump all the way to the bathroom
And to top it all off, I also installed the osmosis system there, which will fill a second tank that will go under the first bench. This also saves me the trouble of having 8L bottles flying all over the house, which we were already fed up with.
I still have to finish some things on the system, and I'm still preparing the cuttings in the air-cloner. I hope to have everything ready this week and be able to start by Saturday!
Then for the tables I bought metal shelves and made a hole for the drains, since in each cube I put a 1/2" PP grommet, which goes directly into the PVC pipe that runs under the table.
And this is how it all looks, with the same distance and distribution for the growing space. Two tables and 18 buckets.
I also took advantage of the fact that I had everything disassembled to install the drain directly into the pipes in the same room, since I knew the pipe was right behind the closet. So I installed a hatch, punctured the pipe, inserted a drain plug, and voilà!
This is actually a huge relief. I won't have to run a hose down the hallway with the drain pump all the way to the bathroom

And to top it all off, I also installed the osmosis system there, which will fill a second tank that will go under the first bench. This also saves me the trouble of having 8L bottles flying all over the house, which we were already fed up with.

I still have to finish some things on the system, and I'm still preparing the cuttings in the air-cloner. I hope to have everything ready this week and be able to start by Saturday!