In the first post in the thread you said you passed the building and electrical inspection but it looks like you haven't even started building. Will you have inspectors through again or is having them before you start the build just a loophole you use to pass inspections. Generally curious.
ya, thought i was. the city guy cam eby after and said to ground the switch.
the pics i posted are from today, i will have a dg lic there until all ducks are rowed. time to boogie. once power is there, i head to the lumber yard delivery service, and order up the material for the first room as mentioned. i already have a brand new 5 ton a/c from dez at h & m langley.
med-maker