O
OHenry
Work done in the Closet.
Work done in the Closet.
I've been cleaning and working all day after wake and baking to some schrom!
I installed three florus into the upper chamber of the closet!
In order to run the florus all day long I've created a door to cover the top opening.
My intentions are to pull the HPS out of the closet and install the MH into the closet. I've had this light since the beginning.
Like I said....I spent a good portion of time cleaning too!
Before-
And After...
Glad I got that out of the way.
Oh ya! I hired two guards to watch over everything...between them...no worries man! Later OH
Work done in the Closet.
I've been cleaning and working all day after wake and baking to some schrom!
I installed three florus into the upper chamber of the closet!
In order to run the florus all day long I've created a door to cover the top opening.
My intentions are to pull the HPS out of the closet and install the MH into the closet. I've had this light since the beginning.
Like I said....I spent a good portion of time cleaning too!
Before-
And After...
Glad I got that out of the way.
Oh ya! I hired two guards to watch over everything...between them...no worries man! Later OH