What's new
  • ICMag with help from Landrace Warden and The Vault is running a NEW contest in November! You can check it here. Prizes are seeds & forum premium access. Come join in!

Shiva Grows

shiva82

Well-known member
big meech wondering why i'm stripping wallpaper, ripping floors up, and taking skirting boards and doors off .
 

Attachments

  • IMG_3345.JPG
    IMG_3345.JPG
    2.2 MB · Views: 6

shiva82

Well-known member
my tile budget is 20 quid per m2 . the screed will cost around 200, the adhesive and grout will cost around 200 . 25 m2 = 500 . 1 day to prepare and screed , at least one day to tile properly with tiled upstand skirts , at least half a day to grout and clean . i have opened a can of worms . i will have to trim all my doors down too
 

shiva82

Well-known member
let there be light

i'm still waiting on these bellends from the electric company . no sign yet . i have been waiting for them since 8 am .
 

Attachments

  • IMG_3347.JPG
    IMG_3347.JPG
    1.2 MB · Views: 3
Top