What’s the plan stan?Really bad news today! Well pump is broke
Topside guy will be here at 10am. Odds are 20% chance he can fix. If no the expensive pull the 400’ deep well and pump head will come in 1-5 days!What’s the plan stan?
Here’s hoping you hit that 1:5 mateTopside guy will be here at 10am. Odds are 20% chance he can fix. If no the expensive pull the 400’ deep well and pump head will come in 1-5 days!
No worries the dogs, plants, and I will be good. It will just take a lot more work.
Mucho Gracious muchacho!Here’s hoping you hit that 1:5 mate![]()
Fixed without missing a single beat. You kicked ass friend.The well professional smart guy replaced the entire topside control box to the tune of $1670 US today. Neat
Me not so much!!!!!Fixed without missing a single beat. You kicked ass friend.
What are you going to do? Some of those tops are almost touching the light.Once again I’m a dumbass for vegging too long being lazy.
It’s day 13-14 minimum 7 more days of stretch and I am getting way to close to max height on the trellis supports and max light height!
My laziness over the holidays is going to take 3x the work now.
Peace View attachment 19133868
One by one the controllers are yellow up high. The tray tables are on casters so it’s no big deal. A control box would be sweet but its a little advanced for my electrical skills.Do those winches work all at a time from a controller of some kind or you go 1 by one when raising or lowering them?
![]()