Here's a shot of the sink after machining. Holes drilled for LED stars, the driver lines, and corner holes for some threaded support poles I machined. The holes for the driver lines have eased edges, so not sharp to cut
This is the prep for wiring. Popsicle stick per Rives.
This is the prep for wiring. Popsicle stick per Rives.
Last edited: