Nubie Biatch
Active member
**Edited some pics just to sate my paranoia. Crazy girlfriends will do that to ya!**
I am almost finished with my flowering room and my clones have just shown roots.
I figured it was about time for me to share a little bit of my work and hope that I can get some good feedback and maybe give a few ideas to others.
I've read volumes on this site. Every DIY, DWC, and grow diary I came across.
I'll be starting another grow diary once I begin to flower my clones. I just wanted to share my grow room with everyone. I will keep updating this thread with my improvements. I should have this room finished by the end of the weekend.
Right now I am bonzai'ing (if that's even a word) my moms so that I will be able to keep a perpetual harvest. I am also going to build a seperate movable veg room with my turbogarden based on a mobile DIY ebb and flow table by fuzygrowth.
My current strains in the mum room are:
Blah, Blah, Blah....I know....pics....
Hooking up Drain off. I used 1 1/2" Spa Flex PVC. I like the flexibility it gives me.
Hooking up Supply Lines. (3/4 ball valves and industrial high PSI hose)
All 16 buckets have drains in the bottom that are being plumbed in to lead back to the resevoir. Taking bigtokes advice on this one. It will make flushing a lot easier!
3/4 fitting for supply. 1 1/2 fitting for drain off
I have put my pump in the center of the table so that it distributes an even pressure to each side. The supply lines are shaped like an H. I also installed cutoffs in the right spots.
I have installed a drain that will allow me to hook up a garden hose and let the pump do all the work when I need to flush. Just connect the hose, turn on the pump, and done!
Going with 2-1000watt HPS hortilux eye bulbs inside cool tubes.
8 inch net baskets secured to the lids with 4 inch holes in the top.
I will probably throw some junk underneath for storage later.
Fitting everything into place.
supply lines with cutoffs. Always go with the ball valves.
My billy badass sequence pump. Lots of pressure and volume!
Drain will go through the rez lid. I don't want any contaminants dropping into the rez
top shot of rez
inside shot of rez. Valve for my 55 gal water reserve.
smoke break
putting insulation on the buckets
installed a/c vent and door.
installed exhaust vent that leads to attic.
my 6 inch vortex wrapped in insulation. It leads to my ozone generator/duct muffler.
I am almost finished with my flowering room and my clones have just shown roots.
I figured it was about time for me to share a little bit of my work and hope that I can get some good feedback and maybe give a few ideas to others.
I've read volumes on this site. Every DIY, DWC, and grow diary I came across.
I'll be starting another grow diary once I begin to flower my clones. I just wanted to share my grow room with everyone. I will keep updating this thread with my improvements. I should have this room finished by the end of the weekend.
Right now I am bonzai'ing (if that's even a word) my moms so that I will be able to keep a perpetual harvest. I am also going to build a seperate movable veg room with my turbogarden based on a mobile DIY ebb and flow table by fuzygrowth.
My current strains in the mum room are:
- Orange Diesel (Verite)
- Lemon Stinky (Marijuana Matt)
- Sweet tooth #3 (duh!)
- WW x ISS (NYCD Fan 042)
Blah, Blah, Blah....I know....pics....
Hooking up Drain off. I used 1 1/2" Spa Flex PVC. I like the flexibility it gives me.
Hooking up Supply Lines. (3/4 ball valves and industrial high PSI hose)
All 16 buckets have drains in the bottom that are being plumbed in to lead back to the resevoir. Taking bigtokes advice on this one. It will make flushing a lot easier!
3/4 fitting for supply. 1 1/2 fitting for drain off
I have put my pump in the center of the table so that it distributes an even pressure to each side. The supply lines are shaped like an H. I also installed cutoffs in the right spots.
I have installed a drain that will allow me to hook up a garden hose and let the pump do all the work when I need to flush. Just connect the hose, turn on the pump, and done!
Going with 2-1000watt HPS hortilux eye bulbs inside cool tubes.
8 inch net baskets secured to the lids with 4 inch holes in the top.
I will probably throw some junk underneath for storage later.
Fitting everything into place.
supply lines with cutoffs. Always go with the ball valves.
My billy badass sequence pump. Lots of pressure and volume!
Drain will go through the rez lid. I don't want any contaminants dropping into the rez
top shot of rez
inside shot of rez. Valve for my 55 gal water reserve.
smoke break
putting insulation on the buckets
installed a/c vent and door.
installed exhaust vent that leads to attic.
my 6 inch vortex wrapped in insulation. It leads to my ozone generator/duct muffler.
Last edited: