I'm drawing up a plan to rewire my room. The existing wiring is shit and I don't want to repair it, so I'm putting in a subpanel and starting fresh using conduit.
For reference, here's everything I'll be running:
2 1kw HPS (12/12)
3 400w MH (18/6)
2 148 CFM Dayton blowers (12/12)
8k BTU window AC unit (24/7) (I think it's 8k BTUs)
Full size refrigerator (24/7)
Mag drive pond pumps (24/7):
1 675 GPH
1 350 GPH
few other small draws like fans and air pumps.
I've attached an image of the part that I'm wondering about. I plan to put the subpanel next to the breaker box, run conduit to an outlet and then up to the ceiling. Then the conduit will run all the way around the room at the ceiling, and drop in 3 places for double gang outlets.
I'm trying to figure out how to set it up so the 2 HPS lights and the 2 blowers all run on a single timer, with a minimum of threaded wiring, a minimum of mess, and maybe with a light switch to turn them all on and off at once.
How would the electrician types here solve this?
For reference, here's everything I'll be running:
2 1kw HPS (12/12)
3 400w MH (18/6)
2 148 CFM Dayton blowers (12/12)
8k BTU window AC unit (24/7) (I think it's 8k BTUs)
Full size refrigerator (24/7)
Mag drive pond pumps (24/7):
1 675 GPH
1 350 GPH
few other small draws like fans and air pumps.
I've attached an image of the part that I'm wondering about. I plan to put the subpanel next to the breaker box, run conduit to an outlet and then up to the ceiling. Then the conduit will run all the way around the room at the ceiling, and drop in 3 places for double gang outlets.
I'm trying to figure out how to set it up so the 2 HPS lights and the 2 blowers all run on a single timer, with a minimum of threaded wiring, a minimum of mess, and maybe with a light switch to turn them all on and off at once.
How would the electrician types here solve this?