As of today ICMag has his own Discord server. In this Discord server you can chat, talk with eachother, listen to music, share stories and pictures...and much more. Join now and let's grow together!
Join ICMag Discord here!
More details in this thread here: here.
200A @ 240V = 48KW, the 80% rule = 0.8 x 48000 = 384000 Watts, I would run 36 x 1000 Watt ballasts to be safe and ad a PLC and contactors to time delay 2 or 4 ballasts at a time to turn on, and 36 is pushing the 80% limit, 32 ballasts is what I would be what I would use. Is it a single or three-phase service.