The 18th ish your thinking.
I will just leave to mature then.
In turms of drying. I'm limitted to where I can out of sight. Would a colder or warmer place be better?
Boiler house or windy attic?
.
I'm getting a 50x50x100cm tent from the wife for xmas. I've decided to try 8 lr2 as I got 20 joint dr reg seeds less then half price. Going to use 2l bottles and about 250-300w of cfls. Any thoughts?
Got a x60-x100 loupe. It looks like I have like 95% cloudy 5% clear. But the pistols are only just turning red at the tips.
Looking at them they have fluffed up in size very slightly over night.
I can't wait! Aha