great thread anyone use 3or 4 inch rebar wire like they put in concrete you can get 4x4s and dowels and a spade bit if you mark all four 4x4s at once you can drill dowel notches at differing heights and put the dowels in and just lay the wire on it it all disassembles easily and you can sometimes scavenge all the parts if you use old broomsticks for the dowels
no digi camera and don't have a scanner to digi drawings
no digi camera and don't have a scanner to digi drawings