Only a few more things left to do and it's time for the
Blunt_69 Gets Serious thread!!!
Haps-No airstones, using airstrips this time in hopes of non clogging.Ran with stones iun the past, way to involved to deal with when a stone died. Still need to drill holes for the airhoses.
The trays do not sag and are quite abit stiffer then rubbermaids, well check em out these updates show it!
Happy to report that everything is going according to plan.. This project is taking a bit longer then anticipated, but it's getting close!!
Shot after trays and Res are in position, dont wanta walk on that tex..
The new trays holding water, leak free!!! New drainage
New leveling lines working perfectly!!
The back tray same level as the rest !!
Top of the table, still have to drill holes for airlines, re-panda plastic... Done!
Everythings working!!!
Almost time to load em up!
Blunt_69 Gets Serious thread!!!
Haps-No airstones, using airstrips this time in hopes of non clogging.Ran with stones iun the past, way to involved to deal with when a stone died. Still need to drill holes for the airhoses.
The trays do not sag and are quite abit stiffer then rubbermaids, well check em out these updates show it!
Happy to report that everything is going according to plan.. This project is taking a bit longer then anticipated, but it's getting close!!
Shot after trays and Res are in position, dont wanta walk on that tex..
The new trays holding water, leak free!!! New drainage
New leveling lines working perfectly!!
The back tray same level as the rest !!
Top of the table, still have to drill holes for airlines, re-panda plastic... Done!
Everythings working!!!
Almost time to load em up!
Last edited: