I started construction this morning. I took a few too many smoke breaks and didn't get a ton of stuff done, but here are some pics of the things that did get done.
This first pic is just a shot of the materials I've had to buy so far (except the reflective mylar, I had that lying around). There is a double lamp socket, lamp cord, 6500K light bulbs, some hinges, wood screws, weather stripping, factory size glass pane, and 1/2" MDF. I used MDF because it was cheaper than ply, but this shit gets crazy with saw dust.
I'm sure I'll be using more materials than these, but the rest of the stuff I already have here around my house.
This is a pic of a cut being set up....
and finally I have all my MDF carcass pieces cut to dimension and labeled....
I had to stop for a while, but I'll pick it back up this afternoon. The next thing to do will be routing a channel for the glass, then coating the inside of the carcass pieces with mylar.
This first pic is just a shot of the materials I've had to buy so far (except the reflective mylar, I had that lying around). There is a double lamp socket, lamp cord, 6500K light bulbs, some hinges, wood screws, weather stripping, factory size glass pane, and 1/2" MDF. I used MDF because it was cheaper than ply, but this shit gets crazy with saw dust.
I'm sure I'll be using more materials than these, but the rest of the stuff I already have here around my house.
This is a pic of a cut being set up....
and finally I have all my MDF carcass pieces cut to dimension and labeled....
I had to stop for a while, but I'll pick it back up this afternoon. The next thing to do will be routing a channel for the glass, then coating the inside of the carcass pieces with mylar.