Construction is proceeding. I’ve run all the wire in the ceiling for the 7-Flexstar LED lights, the two dehumidifiers and the LED grow lights in the Veg room. The line sets and power cables are run to the locations of the heads for the mini split. Each room will have its own heat, AC and dehumidification. More details to follow.