What's new
  • As of today ICMag has his own Discord server. In this Discord server you can chat, talk with eachother, listen to music, share stories and pictures...and much more. Join now and let's grow together! Join ICMag Discord here! More details in this thread here: here.

Help with timer board issue...

Bodah

Member
I recently built this 30 amp board... As you can see from the picture it has 1- 120v un-timed receptacle, 1- 120v timed receptacle and 2- 240v timed receptacles... I attempted to plug in my new nanolux ballasts and a warning error flashed saying "open or short circuit"... I havent tested the receptacles with a multi meter but i circuit tested the receptacles and they are all receiving current...

Any help would be GREATLY appreciated...

B~
 

Attachments

  • _DSC0683.jpg
    _DSC0683.jpg
    59.5 KB · Views: 14

imnotcrazy

There is ALWAYS meaning to my madness ®
Veteran
You CAN NOT use a T104 timer for switching 240 and 120 volt circuits at the same time...

They are designed for either one 240V circuit OR 2 x 120V circuits

Where are you pulling the neutral from for the 120V circuit? Is that a 4 wire romex feeding the T104?

Seems to me like you are trying to use a single double pole breaker to power both circuits, can you take a closer pic of the wiring in the timer box? If this is what you have done, the 120V circuit may be causing a voltage drop on one leg of the 220V and the ballast may detect a large variance between phases as an open leg
 

Bodah

Member
It is indeed romex 10/3... I can snap another picture tomorrow as the lights are off atm...

So what you are saying is the 120v receptacle after the timer needs to get removed, but if I was to relocate it alongside the other 120v receptacle before the timer on the opposite leg the variance issue should be resolved, no?

The wiring for the t-104 is as per the diagram included with the unit~

I understand that running a separate circuit for the 120 appliances would be more appropriate, unfortunately there weren't any more slots left on the sub panel. And personally, I thought that running a sub panel off a sub panel seemed a bit redundant. Keeping in mind I calculated the amperage draw of the appliances and it was less than 70% of the maximum for safe constant draw.
 

imnotcrazy

There is ALWAYS meaning to my madness ®
Veteran
You can always get a few "piggy-back" type breakers to free up some space in your panel

Basically it is 2 single pole breakers on a single chassis, this will allow you to open up a space in the panel and then you can wire your necessary 120V circuit either off the open slot you created OR off the open slot on the "Piggy-back" circuit breaker
 

Bodah

Member
I disconnected everything except for the main two 240V receptacles fed via the t-104, via the 10/3 romex and my ballasts are still not even registering current/attempting to fire...

I should also add that everything is fed via 1- 30A stablock breaker, via a 40A sub panel, and circuit tested, all of the recptacles are receiving current.


Danks for any input...


B~
 

Attachments

  • _DSC0684.jpg
    _DSC0684.jpg
    74.9 KB · Views: 17
  • _DSC0686.jpg
    _DSC0686.jpg
    55.2 KB · Views: 15
  • _DSC0687.jpg
    _DSC0687.jpg
    98.4 KB · Views: 16

Bodah

Member
I'm not crazy is CRAZY! 10 seconds with a friend who is an actual electrician spotted the issue~ And you can service both 120 and 240 receptacles through a double phase feed via a t104... Doubt can be a major constrictor of life~ better safe than sorry IMNC~

Cheers,
B~
 

hvac guy

Active member
You can definitely switch both 240V and 120V loads, just don't go over about 30A to 35A total, the t104 is rated for 40A@240V max. Are you using a tandem stablock, might be mounted so it's onlt getting 120V off the bus, move it one space and you'll have both phases from the bus.
 

Latest posts

Latest posts

Top