synthacide
Member
Since i started growing i realized that the key to quality is environmental control, thus the need for a sealed room or chamber....
i found a lot discussions on the commercially available ones, but being the do-it-yourselfer that i am and knowing the 250 price tag was bs i set out to make my own...
HERE IS MY STORY
we started out with a trip to home depot
x7 3/4 inch pvc pipe (10ft each) $2.19 ea x 7= $15.33
x8 3/4 slip by 1/2 fpt "y" couplings $1.19ea x 8= $9.52
x8 1/2fpt by 3/4 slip coupling $ 0.49ea x8= $3.92
x2 tarp zippers $8.99 ea x 2= $17.98
x1 roll of duct tape $5.49
x1 filtrate furnace filter $15.99
THEN TO THE HYDRO STORE:
x1 roll of black and white poly plastic, also called panda plastic....$89
10 by 100 feet... unfortunately i couldn't source this anywhere else, so of course i got nailed...
grand total = $ 158.13
the bulk of that being the poly plastic sheeting, after the project the roll looks untouched, you could probably make 10 rooms with a roll
And we begin:
Remove doors, shelves, rails EVERYTHING
i found a lot discussions on the commercially available ones, but being the do-it-yourselfer that i am and knowing the 250 price tag was bs i set out to make my own...
HERE IS MY STORY
we started out with a trip to home depot
x7 3/4 inch pvc pipe (10ft each) $2.19 ea x 7= $15.33
x8 3/4 slip by 1/2 fpt "y" couplings $1.19ea x 8= $9.52
x8 1/2fpt by 3/4 slip coupling $ 0.49ea x8= $3.92
x2 tarp zippers $8.99 ea x 2= $17.98
x1 roll of duct tape $5.49
x1 filtrate furnace filter $15.99
THEN TO THE HYDRO STORE:
x1 roll of black and white poly plastic, also called panda plastic....$89
10 by 100 feet... unfortunately i couldn't source this anywhere else, so of course i got nailed...
grand total = $ 158.13
the bulk of that being the poly plastic sheeting, after the project the roll looks untouched, you could probably make 10 rooms with a roll
And we begin:
Remove doors, shelves, rails EVERYTHING